Weil-McLain Boiler: Vent and air plate – mounting and sealing
Vent and air plate - mounting and sealing on a Weil-McLain boiler: Fit, seal and fasten the vent and air termination plate.
Applies to: SVF 500/600 Category IV direct vent, sidewall vent and air plate
How to fix vent and air plate - mounting and sealing: step by step
- Cut the flue pipe so it extends through the wall and fully enters the termination socket.
- Cut the air pipe so it presses against the stops inside the termination.
- Slide the flue and air pipes through the openings, then slide the inside plate onto the pipes.
- Position the inside plate so the pipes slope down slightly toward the boiler at 1/4 in per foot.
- Mark and drill the four mounting holes, remove the pipes, and mount the inside plate.
- Test fit the vent/air termination on the vent pipe. The vent pipe must fully enter the socket and the air pipe must butt against the interior stops.
- Apply silicone RTV sealant inside the vent termination, slide it onto the vent pipe, and rotate slightly to spread the sealant.
- Fasten the termination with four #10 x 1/2 in sheet metal screws and lock washers.
- Seal exterior openings thoroughly with exterior caulk.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Weil-McLain SVF 500/600 Series 1 boiler manual, p. 59-60. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.