Weil-McLain Boiler: Example E – purpose and piping with DHW storage tank
Example E - purpose and piping with DHW storage tank on a Weil-McLain boiler: Variable-primary piping with a DHW storage tank directly piped to one boiler (Boiler 2). DHW is given priority on Boiler 2, which stops network heating on that boiler, while Boiler 1 keeps serving the network. This arrangement has no DHW redundancy and DHW is only available when Boiler 2 is running. A differential pressure by-pass valve is recommended in case a motorized valve fails, to prevent dead-heading the system pump. A 2-way motorized valve with an end switch is recommended and the end switch should wire into the proof-of-closure circuit.
Applies to: Example E variable primary piping with direct DHW tank
How to fix example e - purpose and piping with dhw storage tank: step by step
- Size the DHW tank and DHW pump for the required load and a flow through the boiler and tank within the allowable range in the sizing table.
- Pipe the DHW circulator to the Shadow 2 boiler.
- Install a differential pressure by-pass valve (Item 38) in the system piping.
- Install 2-way motorized isolation valves (Item 17a) with end switches wired to the proof-of-closure circuit.
- Install the system and return immersion sensors within 6 pipe diameters, and no more than 3 feet, from the first and last boiler tees.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Evergreen Series 2 advanced manual, p. 35-36. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.