Other: Boiler tips (part 45 of 45)
Short, practical technician tips on other for boiler. Check each one against the manual for your exact model before acting.
Ultra-80 natural gas boilers need a burner kit for propane
Weil-McLain · Ultra-80 natural gas boilers
Converting a natural gas Ultra-80 to propane also needs a burner in addition to the orifice change. The general instructions in this manual do not apply to this conversion.
- Use only the instructions included in the special-order conversion kit for Ultra-80 natural gas to propane.
Use only approved vent dampers
Weil-McLain · EG 30 through EG 75 and PEG Series 7 boilers
Only the dampers listed in the replacement parts tables are approved for EG and PEG Series 7 boilers. Any other damper can cause severe injury or death.
- Check the damper part number against the approved list before installing.
- Replace the damper with an approved size and type for the boiler model and steam or water application.
Use only genuine replacement parts
Weil-McLain · ECO Tec series 3 80/110/150/199
Buy replacement parts through a local WM Technologies distributor. Modified or non-approved parts are not covered by warranty and can damage the boiler or impair operation.
- Order parts with the boiler model, size, part description and part number.
Use sweep elbows only in vent and air piping
Weil-McLain · ECO Tec Series 3 vent and air piping
Short-radius elbows affect boiler performance and are not allowed in vent or air piping.
- Use sweep 90° or 45° elbows for every elbow in vent and air piping.
- Count each elbow against the maximum equivalent length.
Use sweep elbows only in vent and air runs
Weil-McLain · All direct vent layouts
Short radius elbows reduce boiler performance. Use sweep elbows for all vent and air piping, including the horizontal, vertical and termination runs.
Vent adapter and air intake fittings
Weil-McLain · Direct vent installations
Fittings for direct vent air and flue connections.
- Flue adapter (item 11) fits 3 inch PVC, 3 inch PP, and 3 inch SS.
- Air intake adapter (item 21) fits 3 inch PVC only.
- Internal flue pipe (item 12) carries exhaust from the heat exchanger to the flue adapter.
Vent damper clearances and harness rules
Weil-McLain · Boilers with vent damper
Clearance and harness-disconnect rules for the vent damper. Bypassing the damper lets carbon monoxide into the building.
- Keep at least 6 in. between the vent damper and any combustible material.
- Keep at least 46 in. between the jacket top and a combustible ceiling.
- Never jumper or bypass the vent damper.
- After the boiler has run once, disconnecting either end of the harness causes a safety shutdown. The boiler will not restart until the harness is reconnected.
Vent fittings and reducers
Weil-McLain · All Ultra vent and air piping
Fitting rules for vent and air piping. Use sweep elbows only and reducers in place of bushings.
- Use sweep elbows only in vent and air piping. Do not use short-radius elbows.
- When stepping down from 4 in to 3 in or 3 in to 2 in, use a tapered reducer with a PVC nipple at least 6 in long.
- Do not use a bushing. A bushing will not seal in the boiler flue/exhaust adapter.
- Put a 3x2 reducer at the boiler and at the termination for 2 in runs; put a 4x3 reducer at the boiler and at the termination for 3 in runs.
- Do not mix plastic piping types. Do not use cellular core pipe.
- Stainless AL29-4C vent: install a PVC-to-stainless adapter at the boiler, and at the termination unless using separate-pipe termination.
Vent material limits and bird screens
Weil-McLain · All Ultra vent and air piping
Approved vent materials and the screens that must go on each termination.
- Use only the vent and air materials listed in Figure 13. Use only PVC Schedule 40 with concentric terminations; DWV, CPVC and ABS are not allowed there.
- Use locking collars on every joint of polypropylene vent systems.
- Put a bird screen on every vent and air termination. Screens are sold separately and most kits do not include them.
- For flex polypropylene, convert length with the listed equivalent factors (e.g., Duravent 4 in: 3.0 equivalent ft per ft). Keep the total equivalent length within the Figure 12 limits.
- Stainless AL29-4C vent must be installed with the certified manufacturer adapter.
Vent piping installation practices
Weil-McLain · SVF 1500-3000 Series 1, Category IV venting
Use sweep elbows where possible. Short-radius elbows add pressure loss and reduce allowable vent length.
- Install the vent manufacturer's adapter and reducer (if needed) at the boiler vent connection.
- Slope horizontal vent piping toward the boiler at least 1/4 in per foot.
- Support piping independently of the boiler every 5 ft on horizontal and vertical runs.
- Install a hanger within 6 in of any upturn in the piping.
- Use a locking collar on every joint of polypropylene vent piping.
- Keep total vent length within the maximum in Figure 25 (page 31).
Venting must be Category IV
Weil-McLain · SVF 1500-3000 Series 1
SVF boilers need special venting for a Category IV boiler. Direct vent or direct exhaust is allowed through a side wall or roof. Category II venting is a different method covered on pages 27-28.
- Use only the vent materials and methods listed in the manual.
- Confirm the vent type (direct vent or direct exhaust) and pipe size before installing.
- Follow local codes and the National Fuel Gas Code or CSA B149.1 for the installation.
Venting options and lengths
Weil-McLain · ECO Tec Series 3 boilers, direct vent or direct exhaust
ECO Tec can be direct vent or direct exhaust. Direct vent runs out a sidewall, through the roof, or through dual pressure zones. Direct exhaust runs out a sidewall or through the roof. The vent can run up to 100 ft in PVC, CPVC, PP or stainless steel.
- Choose direct vent or direct exhaust based on the install location.
- Select a sidewall or through-the-roof termination for the chosen mode.
- Keep total vent length within 100 ft using PVC, CPVC, PP or SS pipe.
Vertical direct exhaust termination
Weil-McLain · SVF 1500-3000 Series 1, direct exhaust vertical
Vertical terminations use a coupling or open-end pipe termination and are kept clear of snow and debris.
- Locate the termination away from stones, foreign objects, leaves and sediment buildup.
- Keep the termination at least 12 in above grade and snow line.
- Install a vent manufacturer's bird screen in the open end.
- Keep exposed outside vent length to the maximum in Figure 27 to avoid condensate freezing.
W-M plate orientation
Weil-McLain · W-M sidewall vent/air plate
The plate may be mounted in any of three listed orientations. Do not mount the plate vertical with the vent outlet pointing down.
Warm weather shutdown (WWSD)
Weil-McLain · Evergreen Series 2 control
The boiler will not fire for space heating when outdoor temperature is above the WWSD setting. DHW operation is not affected.
Wire entrances and strain relief
Weil-McLain · Boiler terminal box wiring
Knockouts are in the rear of the terminal box. Strain relief is mandatory.
- Use the twelve rear knockouts in the terminal box for line and low voltage wiring.
- Install strain relief at every jacket knockout used.
- Do not run field wiring without strain relief; this can cause severe injury or damage.
Wiring entrances and knockouts
Weil-McLain · ECO Tec Series 3 field wiring
The boiler has separate line voltage and low voltage entry points.
- Use the front left knockouts for line voltage and external pump voltage only; these lead to the high voltage box.
- Use the bottom right and top right knockouts for low voltage wiring only.
- Seal all wiring entrances when finished.
Wiring notes for spark-ignited pilot ladder diagram
Weil-McLain · EG water boilers, spark-ignited pilot system
Wiring must follow NEC and local codes. Pilot lead wires are not field replaceable, so replace the pilot assembly if they fail. Field replacement wire must be at least 105°C rated, except wires to a rollout TFE, which must be 200°C. Ladder diagram notes also cover zoning and configuration plug settings.
- Replace the pilot assembly if the pilot lead wires are damaged.
- Use at least 105°C wire when replacing original wire. Use 200°C wire for the rollout TFE wires.
- Use zone valves or circulators for multiple zoning, following the component manufacturer's instructions.
Write configuration: caution
Weil-McLain · ECO Tec Series 3 boilers with WM ProTools app
Do not write a saved configuration file unless you are sure it is correct for the application. Write only works if the model number and Master/Shadow/Single setting match the boiler. To view saved files, use WRITE Configuration in the app instead of READ.
Zone circulator relay requirement and wiring limits
Weil-McLain · ECO Tec Series 3 circulator wiring
A circulator whose load is above the rated limits must be run through an external relay with its own power supply. The rating values on the page are garbled in the source, so confirm the exact figures from the wiring section of the manual.
- Check each circulator's full load amps, locked rotor amps and inrush amps against the limits in the manual.
- Provide an external relay and external power to any circulator that exceeds the limits.
- For DHW direct piping, confirm the DHW circulator handles the water heater and piping pressure drop.
Zone valve wiring warning
Weil-McLain · Zone valve systems on the ECO Tec control
Three-wire zone valves must not be used. The voltage on the valve end switch will damage the control. Use only four-wire zone valves with isolated end switches.
- Confirm all zone valves are four-wire with isolated end switches before wiring.
- Replace any three-wire zone valves before powering the control.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.