Domestic hot water scald protection and T&P relief valve

Weil-McLain · EG and PEG Series 7 boilers with domestic hot water

Hot water can scald. Set the domestic hot water temperature with scald risk in mind and make sure a temperature and pressure relief valve is installed.

  1. Use a domestic hot water temperature of 130 F or less, which the manual cites as the Consumer Product Safety Commission and some state recommendation.
  2. If an automatic mixing valve is installed, select and install it per the valve maker's instructions and local standards.
  3. Use the lowest practical temperature setting for the building's occupants.
  4. Check the water temperature at a tap right after the first heating cycle and after any adjustment.
  5. Confirm a temperature and pressure (T&P) relief valve is installed; the manual says this is required.

Domestic water filtration and hardness

Weil-McLain · Combi DHW supply

Filtering and softening protect the DHW flow sensor and brazed plate heat exchanger.

  1. Install a 25 micron or finer filter on the cold line feeding the combi boiler.
  2. Use a finer filter or water softener in harsh water conditions.
  3. Install a water softener if water hardness is above 50 ppm calcium carbonate.
  4. Install drain and isolation valves on the DHW inlet and outlet so the heat exchanger can be flushed.

EG and PEG component locations (water and steam diagram)

Weil-McLain · EG and PEG boilers

Numbered components on the EG/PEG diagram. Items 13 (low water cutoff) and 19 (gauge glass) apply to steam boilers only. The page labels EG Water and PEG/EG Steam are not clearly matched to this diagram.

  1. Gas valve
  2. Pilot burner
  3. Main burners
  4. Gas manifold/orifices
  5. Control module
  6. Vent damper
  7. Transformer
  8. Spill switch
  9. Rollout thermal fuse element
  10. Low water cutoff (steam boilers)
  11. Limit control(s)
  12. Draft hood
  13. Gauge (pressure or pressure/temperature)
  14. Gauge glass (steam only)

EG and PEG wiring and harness component list

Weil-McLain · Boiler model not stated on page; likely EG/PEG

Unlabeled component list on the same page as the EG/PEG diagram. The model it applies to is not stated on the page.

  1. Vent damper
  2. Draft hood
  3. Spill switch wires
  4. Circulator (by others)
  5. Junction box
  6. Transformer
  7. Wiring harness
  8. Rollout thermal fuse element
  9. Main burners
  10. Gas valve
  11. Ignition control
  12. Damper harness

Electrical entrances and wiring knockouts

Weil-McLain · Field wiring

Knockouts are separated by voltage type. Keep line and low voltage wiring in their own areas.

  1. Use the front left knockouts for line voltage and external pump voltage only; they lead to the high voltage junction box (item 20).
  2. Use the bottom right and top right knockouts for low voltage wiring only.
  3. Seal all wiring entrances.

Electrical safety before wiring

Weil-McLain · All SVF boiler wiring

Power must be off before any wiring work, and the boiler must be grounded and bonded.

  1. Turn off electrical power at the service entrance panel before making connections.
  2. Wire to N.E.C. Class 1 and use 105 °C wire if original wire is replaced.
  3. Electrically ground and bond the boiler per NEC ANSI/NFPA 70 or CSA C22.1 and local authority requirements.
  4. Provide a fused disconnect or service switch sized to code.

Energy saving reset override conditions

Weil-McLain · EG water boilers, DOE compliance

The override that lets boiler water temperature track the heating load may be used only when at least one of these is true: an external energy management system reduces water temperature with load, the boiler is part of a modular or multiple system with 300,000 BTU/hr or more total input, or the boiler has a tankless coil.

  1. Confirm one of the listed conditions applies before using the override.

Energy-saving reset override: when it may be used

Weil-McLain · ECO Tec Series 3 boilers

The boiler lowers water temperature as the heating load drops, per the 2007 Energy Act. The override is only for use when at least one of these is true: an external energy management system lowers water temperature with load; the boiler does no space heating; the boiler is part of a modular or multiple system rated 300,000 BTU/hr or more total input. (The tankless coil option does not apply to ECO Tec.)

Energy-saving temperature reduction override

Weil-McLain · ECO Tec 80/110/150/199 Series 3

The boiler reduces water temperature as heating load drops (Section 303, 2007 Energy Act). The override that bypasses this is for use only in the listed cases.

  1. Use the override only if an external energy management system already lowers boiler water temperature as load drops.
  2. Use it if the boiler is not used for space heating.
  3. Use it if the boiler is part of a modular or multiple boiler system with total input of 300,000 BTU/hr or more.
  4. Do not use the override in any other case. The tankless coil condition does not apply to ECO Tec.

Energy-saving water temperature override limits

Weil-McLain · EG / PEG water boilers

The boiler reduces water temperature as heating load drops. The override is meant for external energy management systems and must only be used if one of the listed conditions is true.

  1. Use the override only if an external energy management system reduces boiler water temperature as load drops.
  2. Use the override only if the boiler is part of a modular or multiple boiler system of 300,000 BTU/hr or more.
  3. Use the override only if the boiler is equipped with a tankless coil.

External limit wiring for lockout and auto reset

Weil-McLain · Ultra U-Control external limits

External limits can be added to the U-Control. Manual reset limits require a manual reset from the control even after the limit closes. Automatic reset limits reset the control when the limit closes again. The factory jumper must be removed when these terminals are used.

  1. For manual reset limits, wire the external limit across P13 terminals 1 and 2 and remove the factory jumper.
  2. For automatic reset limits, wire the external limit across P13 terminals 3 and 4 and remove the factory jumper.
  3. After a manual reset limit opens, the control locks out and activates the alarm contacts until reset.

Flood-damaged or water-contacted components

Weil-McLain · Boilers exposed to water

Do not run a boiler, burner or controls that were sprayed with or submerged in water until the boiler is replaced or fully repaired and checked. Equipment exposed to saltwater is no longer covered by warranty and should be replaced. If any electrical component or wiring touched water or may have, replace the boiler.

  1. Do not operate a boiler or controls that were submerged or sprayed with water.
  2. Replace boilers exposed to saltwater or polluted water.
  3. Replace the boiler if any electrical component or wiring contacted water.

Four-zone space heating without DHW (Example A)

Weil-McLain · ECO Tec Series 3, Express Setup Example A

If DHW is not used, the boiler can run a fourth space heating zone from Input/Output 1.

  1. Set Input/Output 1 exactly the same as Input/Output 2.
  2. Assign Input/Output 1 to PRIORITY 2.
  3. Wire the fourth zone thermostat to J17 terminals 1 and 2.
  4. Wire the fourth zone circulator to T2 terminals 4, 5 and 6.

Freeze protection and antifreeze

Weil-McLain · Evergreen boiler hydronic system

Do not use automotive or standard glycol antifreeze, including hydronic glycol. Use only freeze-protection fluids listed in the boiler manual. In Massachusetts, a reduced pressure backflow preventer is required if antifreeze is used.

  1. Thoroughly clean and flush any old system that used glycol before installing the new boiler.

Freeze protection circulators

Weil-McLain · Evergreen Series 2 pump settings

Selected circulators run when the boiler in or boiler out sensor drops below 40°F. Turning off the boiler circulators disables this feature.

  1. Select which circulators should run for freeze protection in Pump Settings.
  2. Keep boiler circulators on where freeze protection is required.

Freeze protection fluids

Weil-McLain · ECO Tec Series 3 hydronic systems

Standard or automotive glycol damages the boiler and system. Only hydronic freeze protection fluids are allowed.

  1. Do not use automotive or standard glycol antifreeze.
  2. Use only freeze protection fluids made for hydronic systems and follow the fluid maker's rules.
  3. Thoroughly clean and flush any old system that used glycol before installing the new boiler.
  4. Use only products listed by WM Technologies for this boiler (see page 109).

Freeze protection fluids and cleaners

Weil-McLain · Ultra Series 4 boilers

Never use automotive or standard glycol antifreeze. Use only hydronic freeze-protection fluids recommended in the manual (see page 140). Do not use petroleum-based cleaning or sealing compounds, as they damage gaskets and seals.

  1. Use only hydronic-rated freeze-protection fluid listed in the manual.
  2. Clean and flush any replacement system that used glycol before installing the new boiler.

Freezing condensate and exposed vent length

Weil-McLain · Ultra outdoor vent and air terminations

Long exposed vent sections can freeze condensate and shut the boiler down.

  1. Keep exposed vent length within the Figure 15 and Figure 21 maximums.
  2. In extremely cold climates install an insulated chase around the vent piping, allowing inspection, with insulation protected from water.
  3. Locate terminations away from prevailing winds that could freeze condensate on surfaces or plants.

Freezing risk during power loss

Weil-McLain · All listed boiler series

Power outages or electrical failures in cold weather can freeze plumbing and cause water damage within hours.

  1. Consider a security system that runs during power outages, senses low temperature and starts a protective action.
  2. Consult the boiler contractor about preventive measures for unattended buildings.

Front door must be installed during operation

Weil-McLain · ECO Tec 80/110/150/199

The jacket door must be in place and fastened during operation. It is only removed for inspection and testing.

  1. Reinstall the front door after service and fasten it securely to the frame.
  2. Do not run the boiler with the door off except for inspection or testing.

Front door security check

Weil-McLain · Ultra Series 4 boiler front door and jacket

The front door must seal all around and stay fastened so the boiler does not draw room air from inside the boiler room.

  1. Visually check that the front door is sealed around its full perimeter.
  2. Make sure the two lower thumb screws are tight.
  3. Reinstall the jacket front door after any service.
  4. If the door does not sit correctly or the gaskets are damaged, contact the installer or technician immediately.

Fuel shipping setting and propane orifice

Weil-McLain · All Ultra models; Ultra-80LP is propane-ready

Ultra boilers ship set for natural gas only. The Ultra-80LP is propane-ready. Any other model needs the propane orifice installed before it runs on propane.

  1. Confirm the boiler fuel before firing.
  2. For propane, install the propane orifice first (see page 48).

Gas leak testing and pipe dope

Weil-McLain · Gas piping at Ultra boilers

Use bubble test only and never an open flame. Above 13 in w.c. test pressure, disconnect the boiler and gas valve from the line. Below 13 in w.c., close the manual main shutoff valve.

  1. Use a bubble test on all gas connections.
  2. For pressure tests below 13 in w.c., close the manual main shutoff valve.
  3. For pressure tests above 13 in w.c., disconnect the boiler and gas valve from the supply piping.
  4. Use pipe dope compatible with propane, applied sparingly only to the male threads so it does not block gas flow.

Gas line sizing reference

Weil-McLain · ECO Tec gas piping

Boiler gas connection is 1/2 in NPT. Size the line from meter to boiler for total input of all connected appliances. Use the capacity table for natural gas. For other requirements refer to ANSI Z223.1/NFPA 54 or CAN/CSA B149.1/B149.2.

  1. Size the gas line for total connected input.
  2. Use the equivalent length from the fitting table to convert fittings to pipe length.

Gas supply piping cautions

Weil-McLain · SVF 1500-3000

Key gas piping rules from the install section.

  1. Install a union for servicing where needed and a manual shutoff valve within 6 ft of the boiler.
  2. In Canada, the installer must identify the manual gas valve.
  3. Support gas piping with hangers, not with the boiler or its accessories.
  4. Use two wrenches when tightening gas piping at the boiler so the boiler connection does not turn.
  5. Use pipe dope that works with propane, applied lightly to male threads only.
  6. These boilers ship set for natural gas only. Install the propane conversion kit before connecting propane (see page 12).
  7. Use a 100% lock-up gas pressure regulator (ANSI Z21.80) if inlet pressure can exceed 14 in w.c.
  8. Set the lock-up regulator for inlet pressure below 10 in w.c. with the boiler at minimum input so there is margin under the high gas pressure switch.

Gas valve and venturi operating principle

Weil-McLain · Ultra-80 through Ultra-399 gas valve and venturi

Gas flows only when air is moving through the venturi. The gas valve senses venturi vacuum. Flue gas dual sensor shuts the boiler down if flue temperature is too high.

  1. If there is no air flow through the venturi, gas will not flow. Check blower operation and air path first.
  2. If the flue gas dual sensor trips, check flue temperature and venting before resetting.

Glycol is a fire hazard

Weil-McLain · Boilers with glycol in the system

Glycol is flammable when hot. Do not store glycol near the boiler or any ignition source. Check the system and boiler often for leaks and fix any leak right away so glycol does not build up.

  1. Keep glycol stored away from the boiler and any ignition source.
  2. Check the system and boiler regularly for leaks.
  3. Repair leaks immediately.

Handling ceramic fiber parts (burner gasket, cover plate insulation, combustion chamber lining)

Weil-McLain · Ultra Series 4 boilers

Burner gaskets (models 80 and 105) and cover plate insulation contain ceramic fiber that can become cristobalite at high temperature. Treat it as a carcinogen hazard.

  1. Avoid breathing dust and avoid skin and eye contact.
  2. Wear an N95 NIOSH-certified respirator (other types may be needed by job site conditions), long-sleeved loose clothing, gloves and eye protection.
  3. Wet the combustion chamber lining or base insulation before removing it to prevent airborne dust.
  4. Place removed lining or insulation in a plastic bag for disposal.
  5. Wash contaminated clothes separately and rinse the washer thoroughly.
  6. First aid: eyes, irrigate immediately. Breathing, move to fresh air.

Hazard levels used in this manual

Weil-McLain · All ECO Tec Series 3 work

The manual uses four hazard levels. The top two warn of severe injury, death or major property damage. The third warns of minor injury or property damage. The fourth gives important install, operation or service notes that are not about injury.

Heat exchanger coating: cleaning limits

Weil-McLain · Ultra Series 4 boilers with coated heat exchangers

The heat exchanger is coated to stop aluminum oxide forming. Mechanical cleaning can shorten the coating life. Heat exchanger inspection is recommended yearly.

  1. For the first 5 years, vacuum or rinse the heat exchanger with water only. No tool cleaning is needed.
  2. Clean only when soiling is clearly present, and flush only with water and mild detergent.
  3. From the cover plate opening, check the collection area and under the vent pipe for debris.
  4. Cleaning should not be needed until 5 years after the commissioning date.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977