Commissioning: Furnace tips (part 5 of 5)
Short, practical technician tips on commissioning for furnace. Check each one against the manual for your exact model before acting.
Residential garage installation
Trane · Furnaces in residential garages
A furnace in a residential garage needs extra protection.
- Mount the furnace so the burners and ignition source are at least 18 inches (46 cm) above the floor.
- Locate or protect the furnace from physical damage by vehicles.
Set thermostat heat anticipator
Trane · AUH1B furnaces
Set the heat anticipator to the measured current flow, or to the value listed in the notes on the wiring diagram.
- Measure the current flow, or find the value in the notes on the wiring diagram.
- Set the thermostat heat anticipator to that value.
Upflow cased coil installation
Trane · Upflow furnaces with cased coil
The cooling coil always sits downstream of the furnace airflow.
- Attach the cased coil with the supplied standoffs and drill screws.
- Insert each standoff into the cabinet alignment hole, run the drill screws through the standoffs, and screw them into the furnace top flange.
- Use the clearance alignment holes near the bottom of the coil wrapper.
Upflow return air openings for high-airflow models
Trane · Upflow 5 or 6 ton models above 1800 CFM
Applies to 5 or 6 ton upflow models where airflow exceeds 1800 CFM.
- Provide return air openings and filters on both sides, or on one side and the bottom, or on the bottom only.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.