Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien General: Installing the drain lines

Updated · by Aurora Star Tech Inc.

Installing the drain lines on a Navien general: Route the drainwater and NDI freeze prevention lines with a proper air gap.

Homeowner with a heating or cooling system problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: WEC600

How to fix installing the drain lines: step by step

  1. Unroll and straighten the LLDPE 1/2in and 1/4in tubes, then cut to length.
  2. Connect 1/2in fittings to the drainwater outlet and attach the 1/2in tube.
  3. Connect the 1/4in tube to the NDI module freeze prevention water outlet.
  4. Keep height at or below 10 ft (3 m) and length at or below 197 in. (5 m).
  5. Leave a 1-1/2in (40 mm) air gap between the tube end and the drain. Do not put the tube end into the drain.
  6. Use an L-shaped pipe at the tube end to stop splashing.
  7. Do not cap or plug the drain lines.
  8. Make sure the drain has no backflow or backpressure.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien General codes

Source: Navien WEC service manual, p. 20-21. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency HVAC Service

647-657-2977