Navien Furnace: Support and drainage of horizontally installed furnace

Updated · by Aurora Star Tech Inc.

Support and drainage of horizontally installed furnace on a Navien furnace: The furnace must drain correctly when installed on its side, so the full length must be supported.

Homeowner with a furnace problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: NPF horizontal and suspended furnace installs

How to fix support and drainage of horizontally installed furnace: step by step

  1. Support the entire length of the furnace when used in horizontal position.
  2. Install a drain pan and stands under the furnace to catch leaks, covering the full area under the unit.
  3. Add a center stand so the furnace does not deform under its weight.
  4. For suspended installs, use 3/8 in threaded rod (6 places) and 2 x 2 x 3/8 in angle iron (3 places), tilted outward for front cover and blower removal.
  5. Use a support deck or board to carry the furnace weight.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Furnace codes

Source: Navien NPF installation and operation manual, p. 75-76. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.