Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Navien Furnace: Level and pitch for condensate drainage

Updated · by Aurora Star Tech Inc.

Level and pitch for condensate drainage on a Navien furnace: The furnace must sit on a level surface with the rear 1/4 in (6 mm) higher than the front to drain condensate.

Homeowner with a furnace problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: NDF600 series

How to fix level and pitch for condensate drainage: step by step

  1. Level the furnace front to back and side to side.
  2. Set the rear of the furnace 1/4 in (6 mm) higher than the front.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Navien Furnace codes

More commissioning tips for furnace

Source: Navien NDF installation and operation manual, p. 13 and p. 15. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Furnace Repair

647-657-2977