Navien Furnace: Ductwork installation steps
Ductwork installation steps on a Navien furnace: Ductwork layout and return air connection for upflow, horizontal and downflow orientations.
Applies to: NDF600 series furnaces
How to fix ductwork installation steps: step by step
- Position the furnace to keep ductwork short and minimise fittings.
- Cut the return air opening the full width of the return air markers on the side panel. Choose bottom, either side, or a combination.
- For upflow, the return duct may connect to either side or the bottom opening.
- For horizontal and downflow, connect the return duct to the designated return opening opposite the supply outlet.
- Do not use the rear panel as a return air inlet.
- Connect the return air duct or filter fitting airtight so combustion gases from nearby appliances cannot be drawn in.
- Leave enough space and access to remove the air filter.
- If an A/C evaporator coil is used, install it on the supply side and make sure no air bypasses it. Never install the furnace downstream of the coil.
- Connect the supply air plenum to the supply outlet. Use flexible connectors where needed and support the adjoining duct independently.
If the unit shows an error code, look it up: Navien Furnace codes
Source: Navien NDF Forced Air Gas Furnace Installation and Operation Manual, p. 18. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.