Navien Furnace: Drainage and venting site requirements
Drainage and venting site requirements on a Navien furnace: Locate the furnace where a leak will cause minimal damage, with a suitable drain nearby. Installing without a drain voids the warranty. Keep vent termination at least 12 in above ground and above the highest expected snow level, or as local code requires if greater. Do not enclose the vent termination.
Applies to: NPF700 all models
If the unit shows an error code, look it up: Navien Furnace codes
Source: Navien NPF installation and operation manual, p. 28. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.