Navien Furnace: Condensate drain piping to floor drain, sump or pump
Condensate drain piping to floor drain, sump or pump on a Navien furnace: Condensate from the trap outlet must go to a floor drain, sump pit, or a condensate pump if neither is available. Any pump used must be rated for furnace condensate. A 1/2 in. CPVC tee on the trap outlet gives a vent branch and a drain branch.
Applies to: NDF condensate drain system
Common causes of condensate drain piping to floor drain, sump or pump
- Vapor lock if the tee vent branch is missing or the line has a low point
- Drain blockage if the overflow vent is omitted
How to fix condensate drain piping to floor drain, sump or pump: step by step
- Route condensate from the trap outlet to a floor drain, sump pit, or approved condensate pump.
- Fit a 1/2 in. CPVC tee to the trap outlet with the branches vertical.
- Add a 1 in. (25 mm) piece of 1/2 in. CPVC to the upper branch as a vent and overflow.
- Connect the lower branch to the drain using 5/8 in. ID / 7/8 in. OD flexible tubing, or run CPVC to the drain.
- Do not cement the drain assembly to the trap outlet if the trap may need removal later; use a piece of the supplied 1/2 in. hose instead.
If the unit shows an error code, look it up: Navien Furnace codes
Source: Navien NDF Installation and Operation Manual, p. 44. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.