Weil-McLain Boiler: Sidewall concentric termination: wall penetration sizes
Sidewall concentric termination: wall penetration sizes on a Weil-McLain boiler: Size the wall opening so the rain cap ribs seat on a solid stop. A thimble is preferred.
Applies to: 3 in and 4 in sidewall concentric termination
How to fix sidewall concentric termination: wall penetration sizes: step by step
- For a 3 in termination, use a thimble with a 4-1/2 in hole, or cut a hole no larger than 4-3/4 in.
- For a 4 in termination, use a thimble with a 6 in hole, or cut a hole no larger than 6-1/4 in.
- Check that the wall is strong enough that the rain cap cannot be pushed in from outside.
- Secure the termination so the rain cap butts against the outside wall or outer thimble plate.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Ultra Series 4 boiler manual, p. 74. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.