Weil-McLain Boiler: Prepare roof penetrations for vertical vent and air pipes
Prepare roof penetrations for vertical vent and air pipes on a Weil-McLain boiler: Size and space the roof holes before setting the terminations. Vent holes need extra clearance around the pipe.
Applies to: Vertical vent/air terminations through roof
How to fix prepare roof penetrations for vertical vent and air pipes: step by step
- Cut the air pipe hole as close as you like to the air pipe outside diameter.
- Cut the vent pipe hole at least 0.4 in larger than the vent pipe: 2-3/4 in hole for 2 in pipe, 4 in hole for 3 in pipe, 5 in hole for 4 in pipe.
- Set a galvanized metal thimble in the vent pipe hole.
- Space the air and vent holes to the minimum spacing shown in Figure 23.
- Follow local code for isolating vent pipe through floors, ceilings and roofs.
- Install flashing and sealing boots sized for the vent pipe and the air pipe.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Weil-McLain Ultra Series 4 boiler manual, p. 24. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.