Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Weil-McLain Boiler: Piping connection sizes and required fittings

Updated · by Aurora Star Tech Inc.

Piping connection sizes and required fittings on a Weil-McLain boiler: Pipe sizes and the fittings needed for the low water cut-off and air relief.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: ECO Tec Series 3 piping

How to fix piping connection sizes and required fittings: step by step

  1. Boiler water outlet and inlet (items 14 and 15): all heat only models and 199 Combi use 1 inch male NPT; 150 and 110 Combi use 3/4 inch male NPT.
  2. Install a tee for the low water cut-off (LWCO) at item 16.
  3. Gas line connection at item 17 is 1/2 inch male NPT.
  4. Air elimination/relief valve (item 38): 3/4 inch male NPT. Use a 3/4 inch tee and 3/4 inch street elbow for the relief valve. Connecting an automatic air vent to the top tee is recommended.
  5. Boiler drain valve (item 23) is shipped loose; pipe it on a reducing tee at the lowest point of the return piping.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

More other tips for boiler

Source: ECO Tec Series 3 boiler manual, p. 8. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977