Weil-McLain Boiler: Gas supply piping installation
Gas supply piping installation on a Weil-McLain boiler: Size the gas line for diameter, length, fittings and maximum gas use. Follow the local code and ANSI Z223.1/NFPA 54 or CAN/CSA B149 for pressure drop. Use Table 11 for pipe capacity.
Applies to: EG/PEG natural gas boilers
How to fix gas supply piping installation: step by step
- Size the pipe for rated boiler input and any future expansion.
- Remove the knock-out disc from the jacket panel where the gas supply enters.
- Install a drip leg at the gas connection inlet; extend it to floor level if the local utility requires it.
- Install a ground joint union where needed for servicing.
- Install a manual shut-off valve outside the jacket per Figure 28 when local code requires it. In Canada the manual main shut-off valve must be identified by the installer.
- Apply pipe joint compound sparingly to pipe threads only.
- Support the piping with hangers, not by the boiler or its accessories.
- Purge all air from the piping.
- Check the boiler and its gas connection for leaks before operation.
- Use a bubble test for leaks. Never use an open flame.
- Close the manual main shut-off valve for any pressure test below 13 in. w.c.
- Disconnect the boiler and gas valve from the supply for any pressure test above 13 in. w.c.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: EG/PEG Series 7 boiler manual, p. 29. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.