Weil-McLain Boiler: Floor foundation and flooring requirements
Floor foundation and flooring requirements on a Weil-McLain boiler: Requirements for floor-standing installations using the pedestal kit.
Applies to: Floor-standing installations with pedestal kit
How to fix floor foundation and flooring requirements: step by step
- Never install the boiler on carpeting, even when a foundation is used.
- Use a solid foundation pad at least 2 inches above the floor if the floor can flood, is dirt, sand, gravel or loose material, or the mounting area is badly uneven or sloped.
- Minimum foundation size for ECO Tec is 20 inches wide by 20 inches deep.
- Foundation may be wood, brick or concrete, at least 2 inches thick.
- If flooding is possible, raise the boiler high enough that water cannot reach it.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: ECO Tec Series 3 boiler manual, p. 13. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.