Weil-McLain Boiler: Direct vent vertical vent / sidewall air: vent termination
Direct vent vertical vent / sidewall air: vent termination on a Weil-McLain boiler: The vent pipe ends in an up-turned coupling with the top at least 1 ft above the air intake. Keep it at least 6 ft from adjacent walls, 5 ft below a roof overhang, 3 ft above any forced air intake within 10 ft, and 12 in below or horizontally from any door, window or gravity inlet. Keep it at least 4 ft horizontally from meters, regulators and relief valves. Do not terminate above a door or window.
Applies to: Direct vent vertical vent / sidewall air configuration
How to fix direct vent vertical vent / sidewall air: vent termination: step by step
- Make a vent pipe penetration hole at least 0.4 in larger than the pipe: 2-3/4 in for 2 in pipe, 4 in for 3 in pipe, 5 in for 4 in pipe.
- Insert a galvanized metal thimble in the vent pipe hole.
- Insert a bird screen into the up-turned coupling. Buy the screen separately if it is not included.
- For 3 in piping on an Ultra-230, cut a 4 in bird screen using the 3 in fitting as a template.
- Keep the finished termination dimensions as shown in the termination figure.
- When several boilers share a wall, keep adjacent terminations at least 6 in apart.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Ultra Series 4 boiler manual, p. 79-80. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.