Weil-McLain Boiler: Concentric vent/air termination (vertical through roof)
Concentric vent/air termination (vertical through roof) on a Weil-McLain boiler: Concentric termination must be assembled and installed before the piping from the boiler is connected. It needs proper roof flashing, supports and a rain cap. Support must prevent slipping and sideways movement without crushing the pipe or drilling into vent or air piping.
Applies to: Vertical concentric PVC kit
How to fix concentric vent/air termination (vertical through roof): step by step
- Cut the roof hole to clear the termination outside diameter per kit instructions and install a corrosion-resistant metal thimble.
- Install flashing and sealing boot sized for the termination.
- Assemble the termination and mount it with supports so it cannot slip or move sideways.
- Do not clamp the outer pipe with sharp-edged clamps that could crack it.
- Do not drill or screw into vent or air pipe or fittings.
- Keep the termination 12 in min above snow line (18 in min for Canada).
- Install the bird screen and cement the rain cap only after the assembly is through the roof and supported.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: ECO Tec Series 3 Boiler Manual, p. 41-42. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.