Weil-McLain Boiler: Closure switch (flow switch or CAD) lockout
Closure switch (flow switch or CAD) lockout on a Weil-McLain boiler: A flow switch or combustion air damper interlock must make before the blower runs. The control allows four minutes for the switch to make, and a lockout occurs if it does not, or if it opens during firing.
Applies to: Flow switch or CAD interlock on Input 2 or Input 3
Common causes of closure switch (flow switch or cad) lockout
- Closure switch not made within four minutes of a call for heat
- Closure switch opens while the burner is firing
- Shared end switch not verifying the damper or louver
How to fix closure switch (flow switch or cad) lockout: step by step
- Confirm the closure switch is an isolated contact.
- For a CAD on one boiler, assign INPUT 3 as AUX PUMP/OUTPUT and select Damper Control.
- For a shared end switch, assign INPUT 2 as AUX PUMP/OUTPUT and select ANY Burner Demand.
- Check that the damper or louver opens and the switch closes within four minutes of the call.
- If the switch opened during firing, check the interlock device for intermittent operation.
- The lockout clears automatically once the closure switch makes.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SVF Series 1 boiler manual, pp. 62-63. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.