Weil-McLain Boiler: Circulator control and expansion for more zones
Circulator control and expansion for more zones on a Weil-McLain boiler: The control can run up to four circulators: the boiler circulator plus three others.
Applies to: SVF 1500-3000 Series 1
How to fix circulator control and expansion for more zones: step by step
- Wire circulators per the field wiring section (page 59).
- Set each input's priority to match its load, using the default Space Heating Priority 2 unless DHW needs a different priority.
- For more than 3 zones with zone valves, add a Weil-McLain WMZV zone valve controller.
- For more than 3 zones with circulators, add a Weil-McLain WMCR zone circulator controller.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: SVF Series 1 boiler manual, p. 17, 18, 21, 22. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.