Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Weil-McLain Boiler: Boiler 120VAC power supply wiring

Updated · by Aurora Star Tech Inc.

Boiler 120VAC power supply wiring on a Weil-McLain boiler: Main boiler power feed on terminal strip T1. Models 110/155 draw under 12 A. Models 220-399 need the load worksheet to size the supply.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Evergreen 110/155/220/299/300/399

How to fix boiler 120vac power supply wiring: step by step

  1. Install a fused disconnect or service switch sized to code (15 A for most cases).
  2. On 220-399 models, complete the total load worksheet (boiler and pump, outputs 1-4, receptacle) before sizing the supply.
  3. Run 120VAC supply to terminal block T1 and connect hot, neutral and ground.
  4. Ground the boiler to the T1 ground terminal. Improper grounding can cause abnormal operation and hazards.
  5. Fit a surge suppressor on the supply line if possible.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

Source: Weil-McLain Series 2 Condensing Gas Boiler Advanced Manual, p. 48. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977