Weil-McLain Boiler: Assemble condensate PVC fittings
Assemble condensate PVC fittings on a Weil-McLain boiler: Solvent-weld joints must be cleaned, primed and cemented in the order given. The gasket seals the jacket at the condensate outlet.
Applies to: All Ultra models, condensate line at jacket
How to fix assemble condensate pvc fittings: step by step
- Remove the PVC fittings and gasket from the accessories bag.
- Deburr and chamfer both ends of the 1/2 in x 1-1/4 in PVC nipple.
- Clean all nipple ends and fittings, then dry them.
- For each joint, prime both surfaces, apply cement while the primer is damp, and apply a second coat of cement.
- Insert the pipe fully into the fitting with a 1/4 turn while the cement is wet. Wipe off excess and check for a smooth bead all round.
- Assemble the 1/2 in nipple to the PVC reducing elbow and let it dry fully.
- Slide the gasket over the nipple, push the nipple through the jacket condensate hole, and cement the 1/2 in tee to the nipple with both upright.
- Press the reducing elbow and tee together while the cement sets so the gasket compresses.
If the unit shows an error code, look it up: Weil-McLain Boiler codes
Source: Weil-McLain Ultra Series 4 boiler manual, p. 27. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.