Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Weil-McLain Boiler: Annual start-up checklist

Updated · by Aurora Star Tech Inc.

Annual start-up checklist on a Weil-McLain boiler: Service technician annual start-up for Ultra Series 4 boilers. Start-up checkout continues at Startup, fill the system (p. 35).

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Ultra Series 4 boilers

How to fix annual start-up checklist: step by step

  1. Address any problems reported by the owner first.
  2. Shut off power before any service work.
  3. Check the boiler area for combustibles, gasoline and flammable vapors.
  4. Check the air intake area for contaminants and remove them.
  5. Remove the jacket front door and inspect the interior. Check door gaskets and replace any damaged gasket.
  6. Clean the venturi air inlet silencer if needed and replace it.
  7. Vacuum sediment from inside the boiler. Clear obstructions.
  8. Do not use solvents on any boiler component.
  9. Clean the condensate trap, check condensate lines, and refill the trap with fresh water.
  10. Check all water and gas piping for leaks. Check gas line per page 29.
  11. Verify combustion and ventilation air openings are clear. Check automatic dampers if used.
  12. Visually inspect flue venting and air piping for blockage, deterioration or leaks. Make sure the air inlet hose is sealed if used.
  13. Check cold fill pressure (usually about 12 psig) and watch pressure rise while the boiler heats up.
  14. Inspect automatic air vents and air separators. Flush vents, replace any that leak.
  15. Check water chemistry (pH, hardness, inhibitor level).
  16. Check the expansion tank (see expansion tank guide).
  17. Inspect and clean the ignition electrode (see ignition guide).
  18. Check ignition and ground wiring and all boiler wiring.
  19. Check control settings in U-Control and external limit controls.
  20. Start the boiler and complete the checks and tests in this manual, then complete the check-out on p. 42.
  21. Check flame inspection and flame signal (see flame guide).
  22. Clean the Nanogate heat exchanger if flue temperature is more than 54°F above return water temperature.
  23. Inspect jacket front door gaskets and replace if needed.
  24. If combustion or performance indicates, clean heat exchanger (p. 126) and clean burner with compressed air only. Vacuum the blower.
  25. Review results with the owner and fill out the Installation and Service Certificate.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Weil-McLain Boiler codes

Source: Ultra Series 4 gas-fired water boiler manual, p. 108-110. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair