Viessmann Boiler: Wall mounting on concrete and studs
Wall mounting on concrete and studs on a Viessmann boiler: Use the enclosed screws and rawl plugs only on concrete. Other materials need bolts and anchors rated for 220 lb (100 kg). On concrete, drill 12 mm holes, install rawl plugs, and screw the bracket on level. On wood studs, drill 3/16 in. pilot holes at the center of each stud. On metal studs, use the supplied fasteners (the pilot hole size is unreadable in this copy). A cross bar or frame may be needed. The wall and studs must carry at least 220 lb (100 kg). Secure the bracket tightly, since loose mounting is a severe hazard.
Applies to: Vitodens 200-W B2HA 80 to 100, 285 to 352
How to fix wall mounting on concrete and studs: step by step
- Drill 12 mm holes into concrete for the rawl plugs.
- Install rawl plugs and screw the bracket to the wall.
- Check that the bracket is level.
- On wood studs, drill 3/16 in. pilot holes at the stud center and secure with bolts.
- On metal studs, use the supplied fasteners and check the bracket is level.
- Add a cross bar or frame if the studs need reinforcement.
- Confirm the wall and bracket are rated for 220 lb (100 kg) and tightened fully.
If the unit shows an error code, look it up: Viessmann Boiler codes
Source: Vitodens 200-W B2HA installation instructions, p. 13-14. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.