Viessmann Boiler: Mount the wall bracket on wood or metal studs
Mount the wall bracket on wood or metal studs on a Viessmann boiler: Wood or metal studs may need a cross bar or frame for reinforcement. The wall and studs must carry at least 115 lb (52 kg). The metal stud pilot hole size is not legible in this extract.
Applies to: Wood or metal stud walls
How to fix mount the wall bracket on wood or metal studs: step by step
- For wood studs, drill 3/16 in. pilot holes at the centre of each stud and fasten with bolts.
- For metal studs, drill pilot holes at the centre of each stud, then fasten with the supplied fasteners and bolts.
- Add a cross bar or frame if the studs need reinforcement.
- Check the bracket is level.
If the unit shows an error code, look it up: Viessmann Boiler codes
Models
Vitodens 200-W B2HB 45Vitodens 200-W B2HB 57Vitodens 200-W B2HB 160Vitodens 200-W B2HB 199
Source: Vitodens 200-W B2HB 19 to 35, 68 to 125 installation instructions, p. 14. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.