Viessmann Boiler: Unpacking and moving the boiler without carrying handles
Unpacking and moving the boiler without carrying handles on a Viessmann boiler: Boiler casting and jacketry ship separately in crates. Lift only by the casting, never by panels, and avoid dropping or bumping the boiler.
Applies to: Vitorond 100 VR1 boilers
How to fix unpacking and moving the boiler without carrying handles: step by step
- Do not lift or position the boiler alone.
- Remove the top and sides of the crate, then lift the front panel up and out.
- Place a wooden block about 12 in. from the rear of the skid.
- Insert two 1 in. Schedule 40 pipes through the openings in the casting legs and center them on the rear block.
- Lift the boiler clear of the skid and remove the skid.
- Lower the boiler until the pipes rest on the front block.
- Remove the rear block by tilting forward by the casting, and the front block by tilting backward by the casting.
- Remove the pipes and reinstall the front panel once the boiler is in place.
If the unit shows an error code, look it up: Viessmann Boiler codes
More commissioning tips for boiler
Source: Vitorond 100, VR1 40 to 63, 161 to 245 Installation and Service Instructions, p. 11. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.