Viessmann Boiler: Hydrostatic pressure test after section assembly
Hydrostatic pressure test after section assembly on a Viessmann boiler: Mandatory after assembly and before any other piping, controls or safety devices are connected to the pressure vessel.
Applies to: Cast iron block after assembly
How to fix hydrostatic pressure test after section assembly: step by step
- Blank off the main return with a 2½ in. NPT plug.
- Close the main supply and fit a pressure gauge (0-150 psig) and an automatic air vent on the safety header side. Use the supplied metric flanges with NPT couplings.
- Fill with room temperature water and bleed all air through the safety header vent.
- If city water pressure is low, use a hand pump on the boiler drain valve.
- Bring pressure to the test value and hold it for 30 minutes.
- Check top push nipple ports with a flashlight. Check bottom ports by sliding paper under the cast iron block.
- Release pressure slowly and carefully. Remove the test plugs after a successful test.
If the unit shows an error code, look it up: Viessmann Boiler codes
Source: Vitorond 200, VD2A Series Installation, p. 21. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.