Commissioning: Water Heater tips
Short, practical technician tips on commissioning for water heater. Check each one against the manual for your exact model before acting.
Check operation after installation
Navien · H2Air add-on controller
Installation must be done by trained, licensed technicians following local codes and wiring rules. After installing, check operation using the manual's instructions.
- Confirm the installation follows local codes and wiring regulations.
- Check the product's operation using the procedures in this manual.
Check rating plate and electrical supply before installing
Navien · NWP500 series
The unit is factory set for 208/240 V, 60 Hz. Confirm the site supply matches before any work starts.
- Check the rating plate on the side of the unit against the site electrical supply and water pressure.
- Do not install if the supply does not match the rating plate.
- Have a licensed electrician connect the supply and grounding.
- Use wire AWG 10 or heavier rated 167°F (75°C).
- Install a breaker larger than the rated amp value on the plate.
- Use a supply that matches the rating plate; wrong power can cause abnormal operation or failure.
Check valve type for vertical and horizontal runs
Navien · H2Air piping layout
Vertical pipe runs need a spring check valve, because a swing check valve must not be used on vertical piping. Horizontal runs can use either a spring or a swing check valve.
- On vertical pipe runs, install a spring check valve.
- Do not install a swing check valve on vertical piping.
- On horizontal pipe runs, install either a spring or a swing check valve.
Connect the NaviLink app over Wi-Fi
Navien · NWP500-50, NWP500-65, NWP500-80
Lets the app monitor temperature and EMS data, turn the unit on or off, and manage schedules.
- Download the NaviLink app from the App Store or Google Play and open it.
- On the water heater, press and hold Menu for more than 5 seconds and select Setting.
- Select Communication and set Wi-Fi communication to On.
- Follow the app to pair with the water heater.
Connecting the extension cable
Navien · NR-21DU remote controller
Run the extension cable from the water heater front panel port to the remote controller cable, through the bracket hole. Up to 2 remote controllers can be connected if needed (optional).
- Connect one end of the extension cable to the port on the front panel of the water heater.
- Pass the other end of the extension cable through the hole in the bracket.
- Connect the end of the extension cable to the cable coming from the remote controller.
- If a second remote controller is used, connect it as an optional addition.
Do not start with supplies closed
Navien · All NPN models
Starting the heater with the gas or water shut off can damage it.
- Fully open the gas supply before turning the water heater on.
- Fully open the water supply before turning the water heater on.
- Do not turn the heater on if the cold water shut-off valve is closed.
Fill and purge before applying power
Navien · NWP500-50, NWP500-65, NWP500-80
The heater has dry-fire protection, but the tank must still be full with all air purged before any electrical connection is made.
- Fill the tank completely with water.
- Purge all air from the tank.
- Make the electrical connections only after this.
Fill and purge before first power-up (dry fire)
Navien · NWP500 initial power-up
Do not energize the unit until the tank is full and all air is out. The dry fire protection only checks the tank at the first power connection, so an empty tank can overheat the element.
- Fill the tank completely with water.
- Purge all air from the tank.
- Only then turn the water heater on.
Heat trap requirement on inlet and outlet
Navien · NWP500-50, NWP500-65, NWP500-80
Top connections have built-in heat traps. Side connections do not. Check local code and add a heat trap nipple, insert or piping if required.
- Check local code for a heat trap requirement on side connections.
- If required, install a heat trap nipple, insert or piping per code.
Install a mixing valve to prevent scalding
Navien · H2Air domestic hot water piping
A mixing valve must be in the system to limit the domestic hot water outlet temperature and prevent scalding. Setting it to 115-120 °F is recommended.
- Install a mixing valve in the domestic hot water line.
- Set the mixing valve to 115-120 °F.
Installation check: condensate, ducting, leak sensor, battery
Navien · NWP500 installations
Final checks on condensate lines, ducting, optional accessories and the front panel battery.
- Confirm condensate lines are installed correctly and run to a suitable drain.
- Confirm the ducting is HVAC approved, no longer than the maximum allowed, and insulated.
- For outside ducting, confirm UL certified terminations are used.
- Confirm ducting is supported and isolated from the structure.
- If a shut-off valve is installed, confirm it is open.
- If the leak detection system is installed, confirm the sensor is dry and not touching water.
- Confirm the battery protection film has been removed.
Installation check: water heater location
Navien · NWP500 installations
Confirm the location before starting up. The unit must be indoors and protected from moisture, freezing and high temperatures, with no flammable vapors nearby.
- Confirm the unit is indoors and protected from moisture, wet conditions, freezing and high temperatures.
- Confirm there are no flammable vapors nearby.
- Confirm air circulation is provided and there is enough space to service the unit, the intake filter and the condensate drain.
- Install the vibration isolation kit if the floor is not concrete.
- Install the earthquake kit if required.
Installation check: water supply and T&P relief valve
Navien · NWP500 installations
Confirm the tank is full, air is purged and there are no leaks. Confirm the T&P relief valve is installed correctly.
- Confirm the tank is completely filled with water.
- Confirm air has been purged from the tank and piping.
- Check water supply lines for tight connections and leaks. Check flexible connections if used.
- Confirm the T&P relief valve is installed and its discharge line runs to an open drain.
- Protect the T&P discharge line from freezing.
Installation check: wiring and power
Navien · NWP500 installations
Check the electrical supply and connections before power-up.
- Confirm the supply voltage matches the rating plate on the water heater.
- Confirm the branch circuit wire and breaker or fuse are the correct size, 30 A.
- Confirm the power connection wire is 10 gauge or thicker.
- Confirm electrical connections are tight and the unit is properly grounded.
Leak sensor placement
Navien · NWP500-50, NWP500-65, NWP500-80
Keep the metal probe of the leak sensor from touching other metal surfaces. Contact can cause a malfunction error. Adhesive details are in the Leak Detection Kit Guide.
- Keep the sensor about 0.2 in (5 mm) above the floor or drain pan.
- Make sure the metal probe does not touch any other metal surface.
Mounting the wall bracket
Navien · NR-21DU remote controller
Fix the bracket to the wall, then hang the controller on it.
- Fasten the bracket securely with 2 screws into the wall, or into the 2 holes in the wall receptacle.
- Hang the remote controller on the bracket by lining up the hooks.
Pair water heater with NaviLink app over Wi-Fi
Navien · NWP500 series with Wi-Fi
Puts the unit into Wi-Fi Connection mode so the NaviLink app can register it.
- Download NaviLink from the App Store or Google Play and open it.
- Hold Menu for more than 5 seconds, then select Setting.
- Select Communication and set Wi-Fi to On.
- Press and hold Power to turn the unit off.
- With the unit off, hold Menu and OK together for 3 seconds to enter Wi-Fi Connection mode.
- Press OK at the guidance screen to show the connection-ready screen.
- Register the unit in the NaviLink app.
- On success the panel shows WIFI CONN-SUCCESS and the unit turns off by itself.
- To exit Wi-Fi Connection mode, hold Back and the unit turns off.
Recirculation pump return line connection
Navien · NWP500-50, NWP500-65, NWP500-80
The return pipe must connect to the cold water inlet side. Otherwise you can get poor circulation, hot water backflow, and lower efficiency and safety.
- Connect the return line to the cold water inlet side of the system.
Recirculation pump wiring terminals
Navien · NWP500-50, NWP500-65, NWP500-80
Connect the temperature sensor to the SENSOR 1 terminal and the wired push button to the SIGNAL 2 terminal on the pump's terminal block.
- Connect the temperature sensor to SENSOR 1 on the pump terminal block.
- Connect the wired on-demand push button to SIGNAL 2 on the pump terminal block.
Return line must go to the cold water inlet side
Navien · ComfortCirc recirculation system with return line
Poor circulation, hot water backflow and lower system efficiency and safety result if the return pipe is connected anywhere other than the cold water inlet side.
- Connect the return water pipe to the cold water inlet side of the system.
- Do not connect the return line to the hot water side.
Setting the clock
Navien · NPN outdoor models with remote controller
Set the minutes first, then the hour.
- Press and hold the Preheat & Timer button for 2 seconds.
- Press Up or Down to set the minutes, then press OK.
- Press Up or Down to set the hour.
Use only approved recirculation kits
Navien · NWP500-50, NWP500-65, NWP500-80
Only the approved Navien recirculation kit should be used. Other recirculation systems can cause improper operation or damage to the system.
- Use only the approved Navien recirculation kit.
- Refer to the product installation manual for compatibility.
Wait before power-up after horizontal transport
Navien · NWP500 after horizontal transport
If the unit was moved horizontally, it must stand upright before it is powered. Starting too early can damage the compressor and reduce efficiency because the oil has not settled.
- Keep the unit upright after horizontal transport.
- Wait at least 24 hours before turning it on.
Water line and layout rules from the installation diagram
Navien · NWP500 series
Plumbing layout points shown with the installation diagram.
- Use dielectric unions at the water connections if copper water lines are used, to prevent galvanic corrosion.
- Run cold and hot lines to either the top or the side outlet and inlet, not both.
- Cap any unused inlet or outlet to prevent leaks.
- Keep the 6 in air gap shown on the diagram.
- Install the T&P relief valve and discharge pipe, condensate drain, drain pan and drain valve as shown in the diagram.
Additional high limit in multi-tank installations
Viessmann · Vitocell 100-V CVWC multi-tank installations
In a multi-tank system, fit an extra high limit device in the common DHW supply header. Wire it in series with the operating control of the tank battery. Set it about 9°F (5°C) above the operating high limit.
- Install an additional high limit in the common DHW supply header.
- Wire it in series with the operating control of the tank battery.
- Set it approximately 9°F (5°C) higher than the operating high limit.
Initial startup and owner handover
Viessmann · Vitocell 100-V CVWC
A qualified heating contractor must perform the initial startup and complete the Maintenance Record (page 30). Explain normal operation, shutdown and emergency shutdown to the owner, and leave the literature at the site.
- Perform initial startup as a qualified heating contractor.
- Complete the Maintenance Record (manual page 30).
- Show the owner the system operation, shutdown and emergency shutdown steps.
- Leave all literature at the installation site and tell the owner where it is kept.
Sensor well and clamp use
Viessmann · Vitocell 100-V CVWC
Use the stainless steel sensor well so the sensing bulb is large enough and well protected. Clamp the capillary bulb against the well with the spring clip for proper contact and heat transfer. Use the sensor clamps for control sensors for maximum operating safety.
- Fit the control sensor into the stainless steel well.
- Secure the capillary bulb against the well with the spring clip.
- Confirm the bulb makes good contact before closing up.
Verify field-supplied controls before startup
Viessmann · Vitocell 100-V CVWC
The installing contractor must check that field-supplied electrical controls work. These include low-water cut-offs, flow switches if used, staging controls, pumps, motorized valves, air vents, thermostats and temperature controls.
- Test low-water cut-offs, flow switches (if used), staging controls, pumps and motorized valves.
- Check air vents, thermostats and temperature controls.
- Confirm the main power and external controls are de-energized before service work.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.