Indoor unit location
Viessmann · Vitocal 100-AW AM2V indoor unit
Place the indoor unit in a heated indoor space near a floor drain and close to an outside wall, so it connects easily to the outdoor unit. The wall must carry the unit's weight.
- Pick a heated indoor location near a floor drain.
- Use an outside wall where possible to shorten the link to the outdoor unit.
- Confirm the wall can hold 100 lb (45 kg).
Initial start-up and maintenance record
Viessmann · Vitocal 100-WA
Initial start-up must be done by a qualified licensed contractor.
- Complete the start-up by a qualified licensed contractor.
- Complete the Maintenance Record properly.
- Make sure the system operator is shown how the system works, how to start and shut it down, and that annual professional service is needed.
Install condensate drain fittings before mounting
Viessmann · All AM2V outdoor units
Drain fittings go into the base pan first. Relief opening count depends on the model.
- Locate the drain relief openings in the base pan.
- Install the supplied condensate drain connectors before setting the unit.
- Expect two relief openings on AM2V 020028 and 051078, and three on AM2V 034043.
Intended use and installation limits
Viessmann · Whole system
The unit is only for sealed, unvented hydronic systems and is designed for space heating, space cooling and DHW heating. Mount the indoor unit so components are protected from water spray or splashing during operation and service.
- Confirm the system is a sealed unvented hydronic system before installing.
- Protect the indoor unit from water spray and splashing.
Keep 25% propylene glycol in closed loops
Viessmann · Closed loop systems
Closed loops must always carry at least 25% propylene glycol in the unit and ground loop. Damage from low antifreeze is not covered by the warranty.
- Confirm the glycol concentration in the unit and ground loop is at least 25% propylene glycol.
- Re-check glycol level after purging and before start-up.
Keep the system dry and clean during install
Viessmann · DLCURA refrigerant circuit
Keep air, dust, moisture and foreign material out of the refrigerant circuit. Contamination can reduce capacity and raise high-side pressure.
- Do not install the connecting pipe until both indoor and outdoor units are mounted.
- Ventilate the area right away if refrigerant leaks during installation.
- Check for leaks after the work is finished.
Limit buried refrigerant pipe length
Viessmann · Refrigerant piping runs
Do not bury more than 36 in. (914 mm) of refrigerant pipe. Any buried section needs a 6 in. (152 mm) vertical rise to the outdoor unit valve connections. Over-length buried pipe can let refrigerant migrate during shutdown and cause liquid slugging that may damage the compressor at start-up.
- Keep buried refrigerant pipe to 36 in. (914 mm) maximum.
- Provide a 6 in. (152 mm) vertical rise to the outdoor unit valve connections on any buried section.
Long line applications
Viessmann · All D5CSRA systems
Line sizing does not change for long lines, but refrigerant must be added. The maximum total line length is 213 ft (65 m).
- Keep the same line size as a standard install.
- Add refrigerant per the long line table for the unit size and line length.
- Do not exceed 213 ft (65 m) total line length.
Mechanical room location requirements
Viessmann · Vitocal 100-WA
Install the unit in a heated indoor area near a floor drain. Where possible, place it near an outside wall to make the ground loop connection easier. The room must not drop below 60 °F (15 °C).
- Place the unit in a heated indoor area near a floor drain.
- Place it near an outside wall if possible.
- Confirm the room stays at or above 60 °F (15 °C).
Mount outdoor unit on a stand
Viessmann · Vitocal 100-AW AM2V outdoor unit
Use a field-supplied stand whose mounting spacing matches the outdoor unit feet. Make sure the condensate drains freely. The stand or wall bracket must be rated for the unit weight, and the manufacturer's assembly instructions must be followed.
- Assemble and secure the stand, matching its spacing to the outdoor unit mounting feet.
- Secure the outdoor unit to the stand.
- Confirm the condensate drains freely (see condensate drain fittings section, p. 38).
Nitrogen flow when brazing fan coil piping
Viessmann · D5CSRA matched with multi-family or residential fan coils
When the outdoor unit is matched with a multi-family or residential fan coil and the fan coil side piping must be brazed, nitrogen must flow through the system while brazing the line set. A filter drier is not recommended with these condensing units.
- Flow nitrogen through the system while brazing the line set.
- Do not install a filter drier with these condensing units.
No PVC or CPVC in ground loop connections
Viessmann · Ground loop connections
PVC or CPVC may only be used for condensate lines. Using it on ground loop connections is not allowed.
- Use approved piping for all ground loop connections.
- Use PVC or CPVC only for condensate lines.
Non-Viessmann DHW tank requirements
Viessmann · Indoor unit with DHW storage tank
Using a DHW tank that is not a Viessmann Vitocell tank changes what the installer must verify.
- Verify the Viessmann DHW tank temperature sensor works correctly with the original tank manufacturer.
- Install a temperature tempering valve in the DHW supply line. Viessmann strongly recommends this.
- Use only tank and heat pump combinations that appear in the Viessmann price list.
On/off remote control function: remove J7 short connector
Viessmann · Indoor unit control board, on/off remote control function
The short connector on J7 must be removed before the on/off remote function is used.
- Remove the short connector on J7 on the indoor control board.
- Connect the on/off remote control to CN23.
Open loop water source requirements
Viessmann · Open loop systems
Only a well or retention pond with enough capacity and good water quality is acceptable. Pond or lake water must not be pumped directly through the units.
- Install an 18-20 mesh strainer in an easy-to-reach location.
- Provide isolation valves so the strainer can be cleaned.
- Replace an undersized well strainer with a larger 18-20 mesh unit if debris restricts it quickly.
- Route discharge water to a well, creek, pond or other use without restriction.
- Do not connect discharge directly to a sprinkler.
- Make sure discharge tubing cannot freeze.
- Water flow is controlled by a modulating water valve or an ON/OFF two position valve.
Open loop water valve options
Viessmann · Open loop systems
The unit works with an ON/OFF two-position water valve or with a proportional modulating water valve driven by a 2-10 VDC signal. Water flow is controlled by the modulating valve when used.
- Select ON/OFF two-position valve or 2-10 VDC modulating valve.
- Wire the valve per the unit wiring diagram.
- Confirm the valve sets water flow at 2-3 GPM/ton.
Outdoor temperature limits for operation
Viessmann · Vitocal 100-AW AM2V
The heat pump only runs efficiently within a set outdoor air range. Outside that range it switches off periodically and the controller shows a notice. Auxiliary electric heat then covers the load.
- Confirm outdoor air is between -13°F and 113°F (-25°C and +43°C) during operation.
- If the unit cycles off at the temperature limits, check the controller notice before troubleshooting further.
- Confirm the auxiliary electric heater is enabled so the building load is still met outside the limits.
Outdoor unit location and mounting
Viessmann · All D5CSRA outdoor units
The outdoor unit must sit level in all directions. Keep the minimum clearance from Fig. 5 open so air can move freely. Do not restrict the air inlets or outlets. Pick a spot that is out of strong winds and can carry the unit's weight. Do not install in locations with special environmental conditions unless the manufacturer approves it.
- Level the outdoor unit in all planes.
- Keep the Fig. 5 minimum clearances clear for airflow.
- Do not block the air inlets or outlets.
- Choose a location out of strong wind that can hold the unit's weight.
Pipe cutting and flaring quality
Viessmann · DLCURA copper line set
Poor pipe preparation reduces efficiency and causes leaks. Cut at 90 degrees without deforming the pipe, then remove all burrs and flare with the factory flare nut in the correct orientation.
- Measure the distance between units and cut the pipe slightly longer.
- Remove burrs with a reamer or deburring tool, holding the pipe pointing down.
- Seal the pipe ends with PVC tape until flaring.
- Place the factory flare nut before flaring, because it cannot be changed after flaring.
- Inspect the flare for cracks and even shape before connecting.
Piping pressure drop must stay within residual head
Viessmann · Vitocal 100-AW AM2V indoor unit
The indoor unit internal pump has a limited residual head. Extra pressure drop in the piping to the buffer tank and indirect DHW coil reduces flow and system performance.
- Size the piping between indoor unit, outdoor unit, buffer tank and DHW coil so total pressure drop stays within the indoor unit residual head.
- Check that the indoor unit flow stays within its minimum and maximum flow range for the model.
Piping support and isolation
Viessmann · Vitocal 100-WA
Support all piping with hangers. Do not let the piping hang from the Vitocal or its components. Fit isolation valves so system components can be isolated.
- Hang all piping from hangers.
- Do not use the Vitocal or its components as a pipe support.
- Install isolation valves on system components.
Power and communication wiring between indoor and outdoor units
Viessmann · DLFSHCH indoor and outdoor unit wiring
Use stranded copper wire rated 600 V, sized per NEC/CEC and local code using the MCA and MOCP values in the electrical data. Power and communication run together from the outdoor unit to the indoor unit. The main line voltage goes on terminals 1 and 2, the communication wire on terminal 3, and green ground on the ground terminal. Keep every connection tight. No wire may touch refrigerant tubing, the compressor or moving parts. If there is high EMF interference, a 14/2 stranded shielded wire can replace the 2 and 3 conductors, with the shield grounded at the outdoor unit only.
- Size wires and disconnect per NEC/CEC, local code and the MCA/MOCP values.
- Use stranded copper, 600 V rated wire only.
- Connect L1 to terminal 1, N or L2 to terminal 2, communication to terminal 3, green to ground.
- Check the 115 V or 208/230 V connection diagram before landing wires.
- Tighten all connections and keep wires clear of tubing, compressor and moving parts.
- If EMF interference is present, use shielded 14/2 for conductors 2 and 3 and ground the shield at the outdoor unit only.
Pre-start-up checklist
Viessmann · Vitocal 100-WA
Confirm these items before energising the unit.
- Confirm the loop is purged and filled, with propylene glycol mixed correctly for closed loops.
- Confirm well pressure and open valves for open loops, and that water flow stops when the system is off.
- Purge all air from hot water loop lines and open all valves. Do not run a dry pump.
- Confirm supply and return grilles and return filter are installed and unrestricted.
- Secure all air chamber service panels.
- Confirm supply voltage matches the nameplate and fuses, breakers and wire sizes are correct.
- Complete low voltage wiring, including thermostat and field safeties.
- Confirm the unit is level and the condensate drain is open and pitched.
- Confirm access panels allow service to the front and sides.
Pressure and temperature limits and plumbing code
Viessmann · Vitocal 100-WA
Exposing the heat pump to pressures or temperatures above the listed values will damage it and void the warranty. All plumbing must meet or exceed local, state and national plumbing codes.
- Check system pressures and temperatures against the listed limits before startup.
- Confirm the plumbing meets local, state and national code.
Purge the domestic hot water (DHW) lines
Viessmann · Domestic hot water circuit
Air left in the unit and the lines between the DHW tank and the unit will cavitate and damage the pump. Purging the building plumbing alone does not clear the unit.
- Close boiler drain valves and the isolation valves.
- Open the cold supply to the DHW tank.
- Open a hot tap and bleed air from the tank, or lift the tank relief valve lever.
- Purge the air remaining in the unit and the lines to the hot water tank.
- Confirm all air is removed from the DHW lines before running the unit for hot water.
Refrigerant line insulation and buried pipe limits
Viessmann · DLFSHCH refrigerant piping
Insulate the two refrigerant lines separately. Do not bury more than 36 in. (914 mm) of refrigerant pipe. If any section is buried, it must rise at least 6 in. (152 mm) to the outdoor unit valve connections. Too much buried pipe lets refrigerant migrate to the cold section during shutdown, which can cause slugging and compressor damage at start-up.
- Insulate each refrigerant line separately.
- Keep total buried refrigerant pipe to 36 in. (914 mm) or less.
- If pipe is buried, provide a 6 in. (152 mm) vertical rise to the outdoor unit valve connections.
Refrigerant line orientation and insulation
Viessmann · DLFSDAH and DLFLDAH indoor ducted fan coils
Refrigerant lines on these units can exit from the side of the unit. Both refrigerant lines must be insulated.
- Orient the refrigerant lines toward the side of the unit where the piping run requires.
- Insulate both refrigerant lines.
Refrigerant line set installation
Viessmann · All D5CSRA systems
Outdoor units ship with a full charge of R-454B. Charges, line sizing and capacities are based on 25 ft (7.6 m) runs; longer runs need a charge adjustment from the long line table. The outdoor unit uses an electronic expansion valve to control refrigerant flow to the indoor fan coil.
- Do not bury the lines deeper than 36 in (914 mm).
- Give the lines at least a 6 in (152 mm) vertical rise to the service valves to prevent refrigerant migration.
- Insulate both lines with at least 1/2 in (12.7 mm) insulation; closed-cell is recommended for long lines.
- Isolate the tubing from the building structure so vibration and noise do not transfer.
- For runs over 25 ft, add refrigerant per the long line table.
Remove air from the system and avoid air traps
Viessmann · Vitocal 100-AW AM2V hydronic side
Air must be removed through air vents in the system supply. Supply and return lines must not contain restrictive piping where air can be trapped, so the heat pump can be fully purged.
- Install air vents in the system supply.
- Route supply and return lines without restrictive pipe sections where air can collect.
- Purge the heat pump of all air.
Remove ground loop caps before connecting
Viessmann · Vitocal 100-WA
Ground loop connections ship with caps fitted. The caps must be removed before the loop is connected.
- Remove the caps from the ground loop connections.
- Connect supply and return to the ground loop.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.