Carrier Mini-Split: Start-up leak check and evacuation
Start-up leak check and evacuation on a Carrier mini-split: Piping checks to complete during start-up of the ductless system.
Applies to: Refrigerant piping
How to fix start-up leak check and evacuation: step by step
- Hold the system at 500 psig (maximum 550 psi) for at least 30 minutes using dry nitrogen. Never use air or oxygen-containing gases.
- Use the Triple Evacuation Method or the Deep Vacuum Method as outlined in the installation manual.
- Confirm the system holds 500 microns for 1 hour after deep vacuum.
- Confirm the line set diameter matches the evaporator connections.
- For conventional fan coils, confirm the line set matches the outdoor unit size.
- Measure the liquid line length, calculate the additional charge, and record the final charge amount.
If the unit shows an error code, look it up: Carrier Mini-Split codes
Source: Carrier D5FSHA installation manual, p. 28. Written in our own words as a summary; always check the original manual.
General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.