Warming things up…Dialing in your comfort…Almost cozy…
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Commissioning: Boiler tips (part 3 of 21)

Updated · by Aurora Star Tech Inc.

Short, practical technician tips on commissioning for boiler. Check each one against the manual for your exact model before acting.

Key installation checks before start-up

NTI · TRX150 and related TRX models

Items from the installation checklist that a technician should verify before firing the boiler.

  1. Gas supply line at least 3/4 in diameter.
  2. Gas line pressure during max and min input stays between 3.5 and 14 in WC for natural gas, or 8 and 13 in WC for propane.
  3. CH relief valve rated 30 psi with at least 3/4 in discharge line to an open drain.
  4. DHW relief valve rated 150 psi with at least 3/4 in discharge line to an open drain.
  5. Vent pitched back to the boiler at 1/4 in per foot.
  6. Vent terminations at least one foot above exterior grade and one foot above maximum snow level.
  7. Supply voltage matches the rating plate (120V AC).
  8. Burner flame checked and combustion verified with a calibrated analyzer.

Limit CO when adjusting high fire, low fire or the gas valve

NTI · TRX boilers, start-up and combustion setting

CO must be checked with a calibrated combustion analyzer during high and low fire adjustments. CO must not exceed 150 ppm at any time. Small changes to the low fire offset or main flow restrictor can raise CO a lot, so do not touch the gas valve without a working, calibrated analyzer.

  1. Connect a calibrated combustion analyzer before any high or low fire adjustment.
  2. Monitor CO continuously and keep it at or below 150 ppm.
  3. Make small adjustments to the low fire offset or main flow restrictor only.
  4. Do not adjust the gas valve without analyzer monitoring.

Low water cutoff test

NTI · Trinity Tft60, Tft85, Tft110, Tft155, Tft175, Tft200, Tft250, Tft300, Tft399

Check before leaving the job and each year.

  1. Before filling, power up: green POWER and amber LOW WATER lights should both be on and a burner demand should not fire, showing Lockout 67 ILK OFF
  2. Fill the boiler; the LOW WATER light goes out; clear the lockout and the burner fires
  3. With the burner running, press TEST: the LOW WATER light comes on and the burner shuts off with Lockout 67
  4. Once a year repeat the TEST step; every 5 years pull the cutoff and clean the wetted surfaces

Power-on and operating modes

NTI · TRX150

After power-on the display shows the current mode: standby, CH request (supply temperature shown), DHW request (DHW setpoint shown), purging cycle, or post circulation on the CH or DHW circuit.

  1. Press the ON/OFF button to power on the boiler.
  2. Read the mode shown on the display.
  3. If a purge or post circulation is showing, wait for it to finish before judging the system.

Pre-start water chemistry and freeze protection

NTI · TRX150 and related TRX models

Poor water quality or lime scale shortens heat exchanger life. Operating above 135°F speeds up scale build-up. Clean and flush the system before installing the boiler.

  1. Flush the system without the boiler connected to remove sediment.
  2. Check the return Y strainer and clean it if needed.
  3. Test water chemistry on both the CH and DHW sides before start-up.
  4. Use only propylene glycol for IWH loops, GRAS rated. Do not exceed 50% glycol unless the manufacturer specifies otherwise.
  5. Never use automotive or ethylene glycol antifreeze.
  6. Do not use petroleum-based cleaning or sealing compounds.

Reducing vent to 2 in on 150 models

NTI · 150 models

Only 150 models may reduce vent diameter to 2 in.

  1. Use a 3 in x 2 in reducing coupling in a vertical run of pipe.
  2. Do not use reducing bushings.
  3. Do not increase vent diameter on any model.

Solvent cement cure and cleanup before start-up

NTI · Plastic exhaust and intake pipe assembly

Plastic vent joints use very flammable cement and primer, so solvent vapour must clear before the boiler is powered.

  1. Do not use excess cement or primer; it can pool inside the pipe.
  2. Let vent assemblies cure for at least 8 hours before powering the boiler.
  3. Make sure the exhaust pipe is beveled and fully seated in the flue adapter before insertion.

Vent connection with PVC

NTI · PVC venting

Do not push PVC into the boiler exhaust connection.

  1. Install the factory supplied 5 in length of 3 in CPVC into the boiler exhaust connection first.
  2. Transition to PVC using approved CPVC to PVC transition cement.

Vent diameter by model

NTI · All models

Vent pipe sizing rules by model.

  1. All models ship with 3 in vent connections.
  2. 150 models may use 2 in pipe.
  3. 199 / 199C models must be vented in 3 in pipe.

Zone valve wiring for valve-based systems

NTI · Valve-based heating zones

In a valve-based system each zone valve opens on a call for heat, and its contacts signal the boiler to fire.

  1. Wire each zone thermostat to its own zone valve.
  2. Make sure the zone valve end switch contacts are wired to the boiler call-for-heat input.

Altitude and venting limits

Rinnai · All I-Series Plus models

Do not install the boiler above 10,200 ft (3,109 m). Venting must be installed per local and national codes. Failure to vent properly can cause death, injury or property damage. Do not block combustion air to the boiler.

  1. Check the install site elevation is 10,200 ft or lower.
  2. Install the vent system per local and national codes.
  3. Keep combustion air openings to the boiler unobstructed.

Apply LPG conversion label

Rinnai · I-Series Plus condensing combi boilers set to LPG

Needed only when the boiler is set to propane.

  1. Place the supplied gas conversion label in an open spot above the existing label on the left side of the boiler.

Automatic de-aeration program (A xx, 17 min)

Rinnai · E50CRN; E75CRN; E75CRP; E110CRN; E110CRP

After power-up or a reset the boiler runs a 17-minute air purge, shown as A followed by the countdown. Block 85 (no flow) also triggers it. The manual gives no key combination to skip it; wait it out or power-cycle and it restarts.

  1. Display A xx = purge in progress, counting down
  2. Burner is released as soon as flow is detected during the cycle

Carbon monoxide alarm before start-up

Rinnai · All I-Series Plus models

The installer must confirm at least one carbon monoxide alarm is installed in the living space before the appliance is put into operation. Rinnai recommends a CO alarm in the hallway near each sleeping area.

  1. Install at least one CO alarm in the residential living space per the alarm maker's instructions and local code before start-up.
  2. Tell the owner to check CO alarm batteries monthly and replace them yearly.

Change altitude setting on the PC board

Rinnai · I-Series Plus PC board, Parameter A3

Sets Parameter A3 for high altitude. Gas pressure does not need to be changed for high altitude when this parameter is used.

  1. Remove the front panel by taking out the two screws that hold it.
  2. Locate the PC board on the lower left side of the unit.
  3. Locate the PC board buttons.
  4. Press the SW1 left button.
  5. Scroll to Parameter A3.
  6. Set Parameter A3 to the letter that matches the site altitude in the altitude table.

Combustion air and venting checklist

Rinnai · All venting and combustion air installations

Confirm these items before leaving the job.

  1. Verify all combustion air opening sizes are correct.
  2. Confirm combustion air requirements are met for the appliance.
  3. Confirm the air is not corrosive. If it is, do not use room air.
  4. Confirm adequate combustion air is available for all appliances in the space.
  5. Confirm the installation meets the National Fuel Gas Code (ANSI Z223.1/NFPA 54) and local and state rules.

Connect a Rinnai BLE push button

Rinnai · I-Series Plus Condensing Combi Boiler with BLE

Pairs a push button that starts recirculation on the boiler.

  1. Press and hold the Bluetooth button on the controller until the Bluetooth LED starts blinking.
  2. Press and hold the Rinnai BLE push button until its green light flashes.
  3. Wait for one beep (paired) or two beeps (pairing expired).
  4. Pressing the BLE push button starts recirculation.

Do not bypass deaeration

Rinnai · I-Series Plus IP060160C

Deaeration must not be skipped during commissioning, after any part of the system is opened or disconnected, or if system pressure has dropped below 13 PSI. Skipping it can damage the boiler, and that damage is not covered by the warranty.

Fill the condensate collector before operation and before venting

Rinnai · I-Series Plus before first start and venting

The condensate collector must be filled with water before the boiler runs and before the vent system is installed, otherwise exhaust gas can enter the building. Failure to fill it can cause severe injury or death.

  1. Pour approximately 10 oz (1.25 cups) of water directly into the boiler exhaust port.
  2. Do this with the 2 in. PVC adapter still fitted to the exhaust port.
  3. Complete this before installing the vent system.

Fill the condensate trap before startup

Rinnai · Condensate trap priming

The manual calls for water to be poured into the exhaust port to prime the condensate trap.

  1. Pour approximately 10 ounces (1.25 cups) of water directly into the boiler's exhaust port before startup.

Installer qualifications

Rinnai · IP060160C, IP090099C, IP090160C, IP090199C, IP120199C, IP150199C

A trained and qualified professional must install, inspect and leak test the boiler. Installation must follow this manual exactly, or the warranty is void. The installer is responsible for proper installation and should leave the manual with the boiler or give it to the owner.

  1. Confirm the installer has gas line sizing, gas/water/electrical connection, local code and vent-through-wall-or-roof skills.
  2. Confirm the installer has training on Rinnai I-Series Plus condensing boilers.
  3. Leave this manual with the boiler or give it to the consumer when installation is complete.

Pair the boiler with the Rinnai Central app over Bluetooth

Rinnai · I-Series Plus Condensing Combi Boiler with BLE

Pairing uses the Bluetooth button on the controller. Your phone or tablet must support Bluetooth 4.0 or newer.

  1. Press and release the Bluetooth button on the controller; the Bluetooth LED turns solid blue.
  2. Log into the Rinnai Central app with a professional account and choose Connect to a Rinnai Boiler.
  3. Wait for the boiler to beep once (paired) or twice (pairing mode expired).
  4. Follow the app steps to set up the boiler.

Parameter changes need trained technician

Rinnai · All I-Series Plus models

Rinnai strongly recommends that only a trained and qualified professional who has attended a Rinnai installation class adjusts parameter settings. Any alteration to the appliance or its controls can be dangerous and will void the warranty.

  1. Only change parameters if you have Rinnai installation training.
  2. Do not modify the appliance or its controls.

Power and fill rules before first firing

Rinnai · I-Series Plus IP060160C

Do not fill the boiler unless permanent power is available. Freeze protection does not work until the boiler is filled, air purged, and supplied with power and gas. Before the first firing, make sure the system is fully deaerated, the gas line is purged, and the pump is primed.

Prime condensate trap before first firing

Rinnai · I-Series Plus condensing combi boilers

Add water to the exhaust port so the integrated condensate trap is primed.

  1. Pour about 10 oz (1.25 cups) of water directly into the boiler exhaust port.

Twin pipe elbow selection

Rinnai · Twin pipe venting

Use long sweep or short sweep 90 degree elbows in twin pipe venting. Do not use close turn elbows.

  1. Use 90 degree long sweep elbows where possible.
  2. Short sweep 90 degree elbows are also acceptable.
  3. Do not use 90 degree close turn elbows.

Vent material and solvent rules

Rinnai · PVC/CPVC venting

Exhaust piping must be solid core. Use the PVC or CPVC fitting, solvent and joining method given by the pipe manufacturer.

  1. Use solid core exhaust piping only.
  2. In Canada, thermoplastic vent pipe must be certified to ULC S636.
  3. Intake pipe may use any material listed in the approved materials table.
  4. Use PVC cement and primer that match the pipe material (PVC D2564, CPVC F493).
  5. Install 2 in vent screens (IPEX 196050) or 3 in vent screens (IPEX 196051) at the termination where the table calls for them.

When primary/secondary piping is required

Rinnai · I-Series Plus condensing combi boiler

Primary/secondary piping is needed in these applications: external pumps, large zoned systems, high flow, high differential pressure, and high pressure drop systems.

  1. Check the CH pressure drop and flow curve (Appendix 14.8) and the DHW pressure drop and flow curve (Appendix 14.9) before sizing the system.

120 VAC supply and overcurrent protection

Viessmann · Vitotronic 100 KW10B

Install the power supply per local authority requirements, or per national codes if none apply. A disconnect switch outside the boiler room is recommended. Protection must be a maximum of 15 A (fuse or breaker) on the 120 VAC supply.

  1. Install a disconnect switch on the 120 VAC supply outside the boiler room.
  2. Fit maximum 15 A overcurrent protection (fuse or circuit breaker) on the 120 VAC supply.

Accessory power supply

Viessmann · Vitodens 200-W B2HA 45, 60 with accessories

Accessory power can be taken directly from the control and is switched by the system on/off switch. The Vitotronic 200-H HK1B mixing valve control, the mixing valve accessory kit and the Solartrol control need their own 120 VAC supply from a wall receptacle.

  1. Connect accessory power at the control if the accessory is switched by the system on/off switch.
  2. Provide a separate 120 VAC supply from a wall receptacle for the HK1B mixing valve control, mixing valve kit and Solartrol.
  3. Install the accessory's own instructions for any remaining steps.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977