Icon
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Commissioning: General tips

Updated · by Aurora Star Tech Inc.

Short, practical technician tips on commissioning for general. Check each one against the manual for your exact model before acting.

Propane conversion must be verified with combustion analysis

NTI · TRX150, TRX199, TRX199C on propane

The conversion is not complete until combustion is checked. This needs a calibrated CO2/O2 and CO analyzer.

  1. Install the LP conversion kit per the LP conversion instructions.
  2. Check operation with a calibrated CO2/O2 and CO combustion analyzer.
  3. Record the conversion on the boiler label as required.
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency HVAC Service

647-657-2977