Icon
Reliable Heating and Cooling Solutions – Quality Service, Fair Prices, Guaranteed Satisfaction!

Bosch Boiler: Start or stop the building drying program (function 7.E)

Updated · by Aurora Star Tech Inc.

Start or stop the building drying program (function 7.E) on a Bosch boiler: Starts and stops the slab drying program. While it is on, the gas settings cannot be adjusted.

Homeowner with a boiler problem? Call (647) 657-2977 or book a service call — licensed technicians across Vaughan and the GTA.

Applies to: Greenstar ZBR/ZWB 21-42-3A wall-hung boilers and ZWB 28-42-3A combis

How to fix start or stop the building drying program (function 7.e): step by step

  1. Open service functions with the service button and scroll with key pad lock / ECO
  2. Select 7.E to start or stop it
Safety: Gas, electrical and refrigerant work must be done by a licensed technician. Turn off power and gas before servicing, never bypass a safety control, and always follow the manufacturer's manual for your exact model.

If the unit shows an error code, look it up: Bosch Boiler codes

Models

ZBR21-3AZBR28-3AZBR35-3AZBR42-3A

Source: Bosch Greenstar wall ZBR-ZWB 21-42-3A service 6721853955 (2025-11) (same content in combi service 6721853953), 11.3 Description of the service functions pp.59-64. Written in our own words as a summary; always check the original manual.

General guidance for qualified technicians. The manufacturer's installation and service manual and local codes always take priority. Aurora Star Tech is not affiliated with, endorsed by or sponsored by any equipment manufacturer; brand and model names are used only to identify equipment and belong to their owners.

Emergency Boiler Repair

647-657-2977